Traditional modular vault burial container design relies on cast-in-place methods, where ready-mixed concrete is taken in trucks along with poured into varieties that have been constructed practical site.

Modular vaults are built with precast concrete panels, depending upon lightweight, transportable types specially designed for secure, vault applications.

Using over 35 a long time experience providing high security vaults globally, the engineering team has identified 7 specific areas in which modular vaults prove themselves superior to classic cast-in-place technology.

1 ) Time and Position Efficiency

When using old-style cast-in-place methods, comprehensive forms must be designed to accept the concrete pour. This activity requires significant time period on-site and departs a big foot-print, meaning access by many other trades to the container area of the facility is usually naturally limited.

Definite Pour into FormsIn our experience, usually it takes a week to prepare the vault form on site and one other week or a few for the pour to be completed.

In contrast, modular vault panels are created to spec at the factory, then shipped and installed on-site. This is done in a more expedient time frame than possible with type builds, pours, and additionally form removal when hardening. Upon delivery, modular panels can be welded into spot with our crew earning a living entirely from inside the container space, causing minimal disruption to work using way outside the container.

All this means the vault area is normally open to work by other trades for more times and for a longer time period than is possible using cast-in-place.

2 . Durability of Materials

Our engineers have found that will modular panels vault panels can be formed with a asphalt strength well over 10, 000 psi*, which means under compression this panels can accept a load of finished 10, 000 kilograms. for every square inch of surface area. For vaults cast by using traditional concrete pours, a psi from 4, 000 fat. is considered very strong.

A lot more astounding, our UL rated Class 1 panel is only 3 inches thick, roughly the same as 12 inches with cast-in-place concrete!

3. Accuracy of Reinforcements

When a form is constructed for a concrete pour, reinforcing all steel metal must be carefully situated inside the form, which will means maneuvering and placing reinforcement into 10-foot-high, narrow, dimly lit spaces. The environment on their own provides natural choices for error, in addition to error in container construction means lowered security.

In modular vault construction, your panels are toss lying flat, allowing perfect access and additionally optical review since every layer can be poured. In contrast to cast-in-place, we guarantee which reinforcement spacing is proper and ideal for every panel.

several. Service Penetrations

As with any storage and workspace, vaults demand electricity, heating and cooling, in addition to security electronics. Such services penetrate the vault walls, giving you a natural security weakness at the point associated with entry. With cast-in-place vaults, those penetrations are "straight through. " Take away the HEATING, for example , and you tend to be essentially looking through a hole in the container wall.

Modular vaults allow us to produce added security where by service penetrations manifest. At International Burial container, we've developed elements that allow you and me to engineer balanced out service connections. You can not see or move your hand in the service openings within our modular vaults. It's one more way that modular vault construction beats cast-in-place!

5. Ceiling Construction

Capping any vault using a secure ceiling are probably the most challenging areas construction. With classic cast-in-place, the walls must be poured along with allowed to harden. Then that ceiling forms ought to be placed and the similar time-consuming process starts out again.

In modular construction, there are not one but two significant advantages when it comes to fly placement. First, fly panels are transferred simultaneously with wall structure panels, allowing for the total assembly process to help flow smoothly in addition to without interruption. 2nd, the weight load involving modular ceiling solar panels is around half that will of traditional engineering, while providing still strength and safety measures benefits offered by modular wall panels.

6. Flexibility of Establish

With cast-in-place, should the forms go up and the concrete pour will start, any opportunity for improve is almost nonexistent. By using modular development, you've got up until the solar panels are in production to pay last minute design problems. Even then, a change during panel manufacturing, while certainly adding expense, is nowhere near the problem of tearing apart documents and poured surfaces at a cast-in-place worksite.

Modular development offers even more flexible choices, as a build choosing panels can be amplified in size at a later date, or even just partially deconstructed along with shrunk in size.

7. A Depreciable House

Unlike the long-term construction of cast-in-place, modular vaults are viewed as a depreciable tool. After all, a modular vault can be disassembled (from the inside) and rebuilt within a new location or maybe sold to another online business.

When you consider the cost, mobility, ease of construction, along with superior security performance of modular vaults, the traditional technique of constructing forms and serving concrete seems thoroughly outmoded.